A water supply project generally consists of a water collection unit, conveyance system, and units for treatment, purification, and distribution. It is necessary to plan, prepare, and design the entire water supply scheme before constructing the units. A proper plan will ensure that an efficient and economical system is finalized with minimum expenses. The scheme should be such that it can be constructed within the allotted budget while permitting future expansion.